One of the architectural rainfall features for the Downtown Juneau Seawalk. Project Information:
Name:  Downtown Juneau Seawalk – Taku Fisheries to Miner’s Cove
Location:  South Franklin Street Waterfront – Juneau, AK
Owner:  City & Borough of Juneau
Project Manager:  Mike Sturrock
Scope of Work:  Drive steel piling, structural steel framing, treated wood decking, install decorative handrail, architectural rain features and additional lighting and other site furnishings.

Project Timeline:  March 2010 – May 2011
Estimated Project Cost:  $2,600,000

 

Aerial view of the seawalk project as shown from the Mt. Roberts tramway in Juneau Alaska.
Construction progress, note the pile driving operation in the background.
Another aerial view of the Downtown Juneau Seawalk project.
Progress photo of the Downtown Juneau Seawalk decking.
Completed Downtown Juneau Seawalk with site furnishings in place.